40 Miller Street

21st March 2022

At 40 Miller Street in Sydney, a leak was identified by an onsite contractors and was reported the morning that it occurred, as well as being picked up through Mirvac’s remote monitoring technology.

The importance of finding and fixing leaks

At 40 Miller Street in Sydney, a leak was identified by an onsite contractors and was reported the morning that it occurred, as well as being picked up through Mirvac’s remote monitoring technology. The leak was running at approximately 5 litres per minute, which equates to over 2.6 ML a year. To put that in perspective, that’s more than an Olympic-sized swimming pool of wasted water annually. In addition to this, if left unchecked, the leak would have cost the asset over $8,500 a year. The leak was flagged with the facilities manager at 40 Miller Street, who immediately took action to repair it. Quick identification and prompt action to repair the leak saved a significant amount of water.

 

Focus Area

 

Natural Resources Natural Resources

Mirvac acknowledges Aboriginal and Torres Strait Islander peoples as the Traditional Owners of the lands and waters of Australia, and we offer our respect to their Elders past and present.  

Artwork: ‘Reimagining Country’, created by Riki Salam (Mualgal, Kaurareg, Kuku Yalanji) of We are 27 Creative.